THE FOUNDATION PROBLEM
A shed tells you its foundation has failed before the ground does. The doors stop latching. One corner sits low. Water runs where it never used to.
We tear out failed shed pads and build the right base back in its place across Lancaster, York, Dauphin, Chester, Lebanon and Berks counties. We move the shed ourselves, haul the old material off and recycle it, and fix the drainage that caused the problem. Foundations are all we do.
KNOW THE SIGNS
Most people call us about the symptom. Here is what the symptoms mean.
“One of these on a young gravel pad is often fixable. Several together, or any of them on concrete, and you are looking at a replacement.”
WHAT CAUSES FAILURE
Most people assume frost. Frost heave is real, and the frost line in this part of Pennsylvania runs around 36 inches, but that is not what we find when we pull up to a sunken shed pad. It is surface water, almost every time.
A stone pad is designed to handle the water coming off the shed roof. It is not designed to take the runoff from half your yard. When the grade sends water into the pad instead of around it, the stone migrates, the soil underneath softens, and the pad settles.
Compaction is the other half of it. A subgrade that was never properly compacted will settle no matter how good the stone was, and new gravel on top does not fix a base that was never right underneath.
So we look at where the water goes before we quote the pad. If the runoff is not corrected, the new pad fails the same way the old one did. Regrading and drainage correction are part of what we do, and on many of these jobs they matter more than the pad.
REPAIR VS. REPLACEMENT
WHAT WE DO
Breaking out old concrete, or excavating settled, weed-grown stone and rotted timber, then hauling it away. Everything we take out gets recycled, and old stone that is still good goes straight back into the new base.
For stone: strip to solid subgrade, compact it, lay woven ground cover, then 2B modified or 3/4 clean stone compacted in lifts inside a pressure-treated border. For concrete: forms squared to the building, wire mesh or rebar sized to the load, a vapor barrier, and control joints cut in.
If the building is still standing on the old pad, it has to come off and go back. Nobody in this market explains how that works, so here it is.
SHED MOVING
You do not need a separate shed mover and you do not need to take the building apart. We use a shed mule or a skid steer depending on access and ground conditions. For lifting a shed off its pad and setting it back on the same site, there is effectively no size limit. If it can be lifted, we can move it aside and put it back.
What we need from you is the shed emptied before we arrive. Everything out. We coordinate the date so there is time.
The shed comes off in the morning, the old base comes out, the new base goes in, and the shed goes back that evening.
Concrete has to cure before it carries a structure, so plan on the shed sitting off the pad at least four to five days. We give you the exact date the slab is ready rather than guessing at it.
If the shed itself is falling apart, moving it carries real risk. Rotted floor framing and soft bottom plates do not survive a lift well, and some sheds cannot be moved at all. If that is what we find, we will say so, and a shed repair specialist or a new building may serve you better. The easiest version of this job is a failing pad with a new shed already on the way, because then nothing has to be lifted at all.
YOUR REPLACEMENT OPTIONS
Woven ground cover, 2B modified or 3/4 clean stone compacted in lifts, held inside a pressure-treated 4×6 border. It drains, it spreads the load evenly, and it is the most cost-effective base for most residential sheds. It is also the one type we can sometimes repair rather than replace.
Formed and poured over a compacted stone base and a vapor barrier, reinforced and jointed properly. The right answer for workshops, heavy storage, anything you will drive onto, and any site where a gravel pad has already failed and the ground is the reason.
Concrete piers that carry the building above grade. Worth asking about if your pad failed because of where it sits rather than what it was made of, particularly on a hillside or ground that stays wet. They work well, but they do not usually save money over a pad, and we will tell you that.
The pad has to come out anyway. If the shed going back on is larger, or you have always wanted concrete instead of stone, this is the least expensive opportunity you will get to change it. Adding two feet now costs a fraction of adding two feet later.
OTHER FOUNDATIONS
Shed pads are the bulk of what we do, but a failed foundation is a failed foundation. We remove and rebuild the same way for detached garage slabs and frost footers, hot tub pads, sun porch and addition foundations, and outbuildings well past shed size. The largest we have put in is a 25 by 61 foundation under a horse barn.
If it sits somewhere between a shed and a garage, we can get the old one out of the ground and put a proper one back. We handle the excavating, regrading and drainage correction that goes with it, which on a failed foundation is often the part that actually solves the problem.
WHAT AFFECTS PRICE
We do not publish a price for this work, and any contractor who quotes a foundation replacement over the phone without seeing it is guessing. The consultation and the site visit are free. Here is what moves the number.
OUR PROCESS
The other piece of advice comes from experience. Tell your neighbors. We once replaced a very old garage foundation sitting right against a property line, which meant digging two to three feet of soil out along the boundary. The neighbor escalated it about as far as it can go. Nothing came of it, but the job would have gone easier if the borough and the neighbors had heard first. It costs nothing to be neighborly.
Shed Foundations Installed
counties served
years of combined experience
Sq. Feet of Foundation Laid
WHO WE ARE
A small, family-run crew working out of Mount Joy. We run two jobs at a time, which means your date is a real date rather than a place in a queue. We serve customers in English and in Pennsylvania Dutch.
Reviews



serving area
Based in Mount Joy, we repair and replace shed and outbuilding foundations across Lancaster, York, Dauphin, Chester, Lebanon and Berks counties.
We have gone outside that footprint for the right project, including a 14 by 30 pad down in Westminster, Maryland on short notice. If you are not sure whether you are in range, call and ask.
Lancaster
York
Dauphin
Chester
Lebanon
Berks
FAQ
Tell us what you are working with.